Delegated Plans synchronization

A delegated Plan can as well be delegated to a downline Reseller.

Parameters of delagated Plans that can not be synchronized

If a Plan Period or a Plan Resource were deleted then the Plan Period or the Plan Resources of a corresponding delegated Plan are not deleted.

The following Plan parameters can not be synchronized (see Editing general information about the Plan):

Automatic synchronization of delegated Plans parameters

The following Plan parameters are synchronized automatically for the whole chain of delegated Plans and for all Resellers:

Manual synchronization of delegated Plans parameters

The delegated Plan is synchronized only between the current Reseller and selected downline Reseller (see Viewing the List of Resellers).
For example, the Reseller 2 plans are synchronized with the Reseller 1 Plans, the Reseller 3 Plans are synchronized with the Reseller 2 Plans.

To synchronize delegated Plans manually:

  1. Sign in to the Operator Control Panel.
  2. On the Navigation Bar, click Operations > Operations > Resellers. The Workspace displays the List of Resellers (see Viewing the List of Resellers).
  3. Click the Name link of the required Reseller. The page with the detailed information about the selected Reseller appears (see Viewing and updating Reseller general information).
  4. Click the Delegated Plans tab. The Workspace displays the List of delegated Plans (see Viewing the List of delegated Plans).
  5. Click the ID of the required Plan. The Workspace displays the delegated Plan management page.



  6. Click the Synchronize button. The page of Plan synchronization management appears.



  7. On the Plan synchronization management page set the following options:

    • Select the Install new plan periods checkbox to add new Plan Periods.
    • Select the Update plan periods to update the following Plan Periods parameters:
      • period;
      • the Trial parameter;
      • description.
    • Select the Install new resources to add new Plan Resources.
    • Select the Update resource names to update the Plan Resources names.
    • Select the Update resources limits to update the following Plan Resource parameters: Included, Minimum, Limit and 
  8. Click the Synchronize button.
  9. Click the Confirm button in the confirmation window. The selected Plan is synchronized with the corresponding Plan of the upline Reseller.